Option 1
Fit threaded rod to bottom
of post if concreting in.
Option 2
If driving into ground with ram rod
or sledge hammer, tap spike into
the bottom of post.
Fit post in ground
until angle iron is fully
bedded into the ground.
(Make sure it is Vertical)
Check for buried services
Fitting the Dispenser to the bin