Fitting the Dispenser to the bin
Fit post in ground
until angle iron is fully
bedded into the ground.
(Make sure it is Vertical)
Check for buried services
Option 1
Fit threaded rod to bottom
of post if concreting in.
Option 2
If driving into ground with ram rod
or sledge hammer, tap spike into
the bottom of post.